English

English

Heavy Duty Excavator

Railway Track Laying Machine for Modern Railway Construction Machine

The probability of our railway changes rail track sleepers breaking down is very low. According to customer feedback, under normal working conditions, there will be no failure.


  • Item NO.:

    JG150LT
  • Lead Time:

    15-45 days
  • Product Origin:

    China
  • Brand:

    JingGong
  • Shipping Port:

    xiamen
  • Payment:

    FOB
  • Market Price:

    $110000
  • Color:

    yellow/ orange/ blue

how can we help you

how can we help you Contact Us
  • Product Detail
  • Technical Specifications

Railway Track Laying Machine for Modern Railway Construction Machine


l Railway Changes Rail Track Sleepers Features: 

1. The whole machine use high-quality steel, which is strong, reliable and more durable

2. New condition engine with turbocharged, adopt domestic famous engine brand, which ensures low fuel consumption, strong power and high reliability

3. When walking, even if the working device is operated, there will be no curved travel or speed change, and stable linear travel can be achieved.




l Railway Changes Rail Track Sleepers Main Parameters:

(Length*width*height) travel position
7500*2500*3500mm
Machine weight
13000kg
Rated Power
102kw



l Process:



l Certificates:




 Excavator for Sleeper Laying Machine Description


In order to meet the needs of fast, safe and efficient railway transportation, the working section of each railway bureau needs to replace the failed concrete sleeper frequently to ensure the safety of driving, which is one of the important work contents of railway speed increase.

 

The previous way to replace the sleeper is manual work, labor intensity, slow speed, low efficiency. And power company JG80L railway sleeper changer machine, compared with other large pillow changing machine high purchase costs, short and concise, simple operation, cost-effective, greatly improve the work efficiency. JG80L can not only install the sleepers in the early stage of railway construction, but also clean the stones next to the sleepers and replace the sleepers in the later stage of construction.


Our Service

1. Catalogue price  support. 

2. Top quality control Size as your request competititve price fast delivery time

3. Competitive factory price competitive direct factory price. 



SPECIFICATIONS
RANGE OF OPERATION Boom length 4200mm
Arm length 2000mm
Angle of rotation of The Shear 360°
Max.Opening Distance of The Shear 650mm
Length Of Hydraulic Shear Blade 2-2*185mm
Maximum Cutting Force (in middle of blade) 350KN
Maximum Lifting Height of Car Pressing Hand 2000mm
Maximum Distance of Car Pressing Hand Working 4780mm
DIMENSION (Length*width*height)Transport Dimensions 7500*2500*3500mm
Roller gauge 2850mm
Track gauge 1960mm
Width Of Crawler 500mm
Ground clearance of counterweight 940mm
Min ground clearance 420mm
TECHNICAL PARAMETERS Angle of rotation 360°
Machine weight 13000kg
Engine model YUCHAI
Rated Power 102kw
Rated Speed 2200r/min
Hydraulic system working pressure 28Mpa
Hydraulic system flow 260L/min
Variable piston pump 2*63ml/r
Max Hauling force 76.5KN
Walking speed (High speed/Low speed) 5/2.9km/h
Grade Climbing ability 70%/35°
Full circle swinging time 5s
Swing Overload Pressure 25Mpa
Fqt Fuel Quantity ≥8L/h
Capacity Of The Fuel Tank 200L
Hydraulic Tank Capacity 200L

Send A Message

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Related products
JG150L Railway Excavator with Ballast Tamping Machine
JG150L 13.5Ton Railway Ballast Tamping Machine Crawler Excavator
The hydraulic turnout tamping machine is suitable for tamping operations of complex and difficult turnout sections in line maintenance.  Turnout switch parts, turnout connecting parts, turnouts and rail protection parts can be tamped.  The machine is easy to operate, light in weight, high in operation efficiency and low in failure rate, a1
Railway Excavator with Screening Bucket
JG150L 13.5Ton Railway Crawler Excavator with Screening Bucket
Jinggong Railway Screening Machine, it mainly suitable for cleaning and screening the ballast stone on the slope of railway sleepers. It can classify and screen mixed garbage, wood chips, construction residues, etc..
Sleeper Changer  Railroad Tie
Railroad Ties Changer Sleeper Replacer Machine
This model is equipped with energy-saving and efficient turbocharged exhaust engine, and the National III emission standard, maximize the power of the engine and reduce power loss. 
Sleeper Changer  Railroad Tie
Excavator Using Railroad Sleeper Changer digger
This model is equipped with energy-saving and efficient turbocharged exhaust engine, and the National III emission standard, maximize the power of the engine and reduce power loss.
Sleeper Replacement Machine Factory
Sleeper Replacement Machine
We wii provide the highest quality sleeper replacement machine and maintenance services .  The probability of our railway tie replacement breaking down is very low. According to customer feedback, under normal working conditions, there will be no failure. 
Sleeper Laying Machine
Excavator for Sleeper Laying Machine
 The probability of our excavator for sleeper laying mchine breaking down is very low. According to customer feedback, under normal working conditions, there will be no failure. 
Tamping Performed Railway Ballast
Tamping Performed Railway Ballast Machine
Track machine railway is used for the construction and maintenance of railway lines.
 Rail Tamping Machine
Rail Tamping Machine for Crawler Excavator
 JingGong rail tamping machine for crawler excavator adheres to the core values of "Technology Supports The Enterprise, The Quality Contains Great Trust and the business philosophy of "Dedication, Quality, Credit Innovation" and the enterprise spirit to work with you to create a brilliant tomorrow.
Leave a message
Leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

News

contact